The state-run ACNC news agency reported that the Ministry of Electric Power Industry launched a campaign to readjust and strengthen the production processes and facilities of power plants and improve equipment capacity while meeting immediate electricity demands.
This year, thermoelectric power plants in different parts of the country repaired boilers and turbines, replaced defective turbine blades and met the goal of replacing and repairing pneumatic preheater boxes in order to increase combustion efficiency.
Hydroelectric power plant officials and workers responsibly carried out repair of generating equipment and sediment dredging and increased operational efficiency.
In the field of power transmission and transformation, effective measures were taken to protect the power supply system from catastrophic meteorological events, and an optimized project was introduced to organize the power grid based on geographic information, which made it possible to reduce bypasses as much as possible.
mh/arm/ro/nvo